Estimating software for electrical contractors
Count the plans.Price the job.Send the bid.
SparkQuote does the takeoff from your PDF plans, applies your labor units and your prices, and builds the proposal you send to the GC. You check every count before it goes out.
Built for shops of 1 to 50: residential, light commercial and tenant improvement. Free during the beta: 5 AI takeoffs a month, no credit card.
The highlighter takeoff, without the highlighter.
Same method you already trust: go sheet by sheet, mark every device, count them up. SparkQuote does the marking. You do the checking.
Sound familiar?
Still counting receptacles for Monday’s bid
The takeoff is the part nobody pays you for, and it eats the weekend.
Addendum #3 lands a day before the bid is due
Now you’re hunting for what changed across every sheet.
Rounding up to make the deadline
Pad it and you lose the job. Miss something and you eat it on the job.
How it works
Five steps, plan set to proposal. You stay in charge of every one.
| Step | What you do | What SparkQuote does |
|---|---|---|
| 1 | Upload the PDF plan set | Finds the electrical sheets and reads the scale. |
| 2 | Wait a few minutes | Counts receptacles, switches, fixtures by type tag, panels and data, using the legend on your drawings. |
| 3 | Check the counts on the plan | Highlights every device on the sheet and flags anything it is unsure of. |
| 4 | Pick your labor units and prices | Applies your labor units and prices to every counted item. |
| 5 | Send the proposal | Adds overhead and margin and builds a proposal with your logo, inclusions and exclusions. |
It counts.
You sign.
Your name goes on the bid, so nothing goes out without your say. When the software isn’t sure what a symbol is, it asks you instead of guessing.
- Your symbols
- Reads the legend on your sheets
- Your labor units
- Start from ours, edit them to yours
- Your prices
- Set on each item, from your supplier quotes
- Your data
- Export any estimate to Excel, any time
Free calculators worth bookmarking
Every answer shows the math and the NEC table it came from. No sign-up.
5.19 V drop, 2.16% of 240 V. Within the 3% branch-circuit guideline.
- Voltage drop
- 5.19 V
- Percent drop
- 2.16%
- Voltage at the load
- 234.8 V
- Circular mils (Ch. 9 Table 8)
- 26,240
Calculation aid; verify against the adopted code and project conditions. Automated checks are not licensed professional review.
Reference charts
Printable charts from the NEC tables, free to use on your own site with a credit link.
- Wire gauge chart14 AWG to 4/0
- Wire ampacity chartTable 310.16
- Conduit fill chartEMT and PVC
- Electrical symbols chartPlan legend
- Voltage drop formulaCh. 9, Table 8
- Wire size by amps15 A to 200 A
Wire size for a 20 A, 30 A, 40 A, 50 A, 60 A, 100 A service, 200 A service.
Free during the beta
5 AI takeoffs a month, unlimited estimates, no credit card. After the beta, flat monthly plans with no per-bid fees and no setup fee. See the planned plans.
Starter
One estimator, a few plan sets a month
1 user · 10 takeoffs a month
Pro
Bidding most weeks, handling addenda
Up to 3 users · unlimited takeoffs
Team
An estimating team tracking job costs
Up to 10 users · estimate vs. actual
Got a bid due Friday?
Run your next plan set through SparkQuote. It's free during the beta.