Free NEC calculators. No sign-up, no email.Open the calculators
Get early access

Estimating software for electrical contractors

Count the plans.Price the job.Send the bid.

SparkQuote does the takeoff from your PDF plans, applies your labor units and your prices, and builds the proposal you send to the GC. You check every count before it goes out.

Built for shops of 1 to 50: residential, light commercial and tenant improvement. Opening soon; the calculators are free now.

The highlighter takeoff, without the highlighter.

Same method you already trust: go sheet by sheet, mark every device, count them up. SparkQuote does the marking. You do the checking.

Sound familiar?

SUN 9:40 PM

Still counting receptacles for Monday’s bid

The takeoff is the part nobody pays you for, and it eats the weekend.

THU 3:15 PM

Addendum #3 lands a day before the bid is due

Now you’re hunting for what changed across every sheet.

FRI 11:55 AM

Rounding up to make the deadline

Pad it and you lose the job. Miss something and you eat it on the job.

How it works

Five steps, plan set to proposal. You stay in charge of every one.

StepWhat you doWhat SparkQuote does
1Upload the PDF plan setFinds the electrical sheets and reads the scale.
2Wait a few minutesCounts receptacles, switches, fixtures by type tag, panels and data, using the legend on your drawings.
3Check the counts on the planHighlights every device on the sheet and flags anything it is unsure of.
4Pick your labor units and pricesApplies them, with adjustments for ceiling height, remodel and occupied space.
5Send the proposalAdds overhead and margin and builds a proposal with your logo, inclusions and exclusions.

It counts.
You sign.

Your name goes on the bid, so nothing goes out without your say. When the software isn’t sure what a symbol is, it asks you instead of guessing.

Your symbols
Reads the legend on your sheets
Your labor units
Import yours or start from ours
Your prices
Your price list or a supplier quote
Your data
Export any estimate to Excel, any time

Free calculators worth bookmarking

Every answer shows the math and the NEC table it came from. No sign-up.

5.19 V drop, 2.16% of 240 V. Within the 3% branch-circuit guideline.

Voltage drop
5.19 V
Percent drop
2.16%
Voltage at the load
234.8 V
Circular mils (Ch. 9 Table 8)
26,240

Straight pricing

Flat monthly. No per-bid fees, no setup fee. Compare plans.

Starter

One estimator, a few plan sets a month

$99/mo

1 user · 10 takeoffs a month

Pro

Bidding most weeks, handling addenda

$199/mo

Up to 3 users · unlimited takeoffs

Team

An estimating team tracking job costs

$399/mo

Up to 10 users · estimate vs. actual

Got a bid due Friday?

Get early access and run your next plan set through SparkQuote.

Get early access