Panel Schedule Template and Generator
28,400 VA connected. A: 14,950 VA, B: 13,450 VA. Imbalance 10.0%.
- Total connected load
- 28,400 VA
- Phase A
- 14,950 VA
- Phase B
- 13,450 VA
- Imbalance (highest vs. lowest phase)
- 10.0%
- Spaces used
- 11 of 30
| Circuit | Description | Breaker | A (VA) | B (VA) |
|---|---|---|---|---|
| 1 | Kitchen receptacles | 20 A / 1P | 1,500 | |
| 2 | Kitchen receptacles | 20 A / 1P | 1,500 | |
| 3 | Microwave | 20 A / 1P | 1,500 | |
| 4 | Dishwasher | 15 A / 1P | 1,200 | |
| 5-7 | Range | 50 A / 2P | 6,000 | 6,000 |
| 6-8 | Dryer | 30 A / 2P | 2,500 | 2,500 |
| 9-11 | Water heater | 30 A / 2P | 2,250 | 2,250 |
| 10 | Lighting | 15 A / 1P | 1,200 |
Calculation aid; verify against the adopted code and project conditions. Automated checks are not licensed professional review.
A panel schedule is the table that lists every circuit in a panelboard: its number, what it feeds, the breaker size and poles, and the load it puts on each phase, with the panel's ratings in a header and phase totals at the bottom. The generator below builds one you can print for the panel door or attach to the drawings.
Choose the panel type (120/240 V single-phase, 208Y/120 V or 480Y/277 V three-phase), the number of spaces and the main breaker. Enter each circuit's description, breaker size, poles and load. The generator lays out odd circuits on the left and even on the right, totals the load on each phase, and you can print it or save it as a PDF from your browser. If you'd rather fill one in by hand, download the blank schedules below.
Free. No sign-up, no email. The worked example from this page is filled in so you can check the math, then replace it with your job.
- Printable PDF 218 KB
- Excel workbook (.xlsx) 10 KB
Panel schedule templates by size and voltage
The PDF has one landscape page per layout, ready to print for the panel door or a submittal. The Excel workbook has a sheet per system that adds up each phase as you type.
| Layout | Use it for | Excel | |
|---|---|---|---|
| 120/240 V, 1-phase, 24 spaces | Garages, subpanels and other small panels, up to 24 circuits | Page 1 | 1-phase sheet (cross out the rows you don't use) |
| 120/240 V, 1-phase, 42 spaces | 200 A residential services and larger single-phase panels | Page 2 | 1-phase sheet |
| 208Y/120 V, 3-phase, 42 spaces | Commercial lighting and receptacle panels | Page 3 | 208Y/120 V sheet |
| 480Y/277 V, 3-phase, 42 spaces | 277 V lighting and 480 V HVAC and motor panels | Page 4 | 480Y/277 V sheet |
| 208Y/120 V example, filled in | The 3-phase worked example below, with every row completed | Page 5 | — |
What a panel schedule must show
NEC 408.4(A) requires every circuit and circuit modification to be legibly identified by its clear, evident and specific purpose or use, with enough detail to tell it apart from every other circuit. The directory must be on the panel face or inside the door. Descriptions can't depend on things that will change, like a tenant's name or "Bob's room."
A useful schedule includes:
- Panel name, location and the source it's fed from (408.4(B) requires this for panels in other than one- and two-family dwellings).
- Voltage, phase and wire configuration.
- Main breaker or main lug rating, and the bus rating.
- Available fault current / AIC rating where required.
- Each circuit: number, description (for example, "Kitchen countertop receptacles – east wall"), breaker size and poles, and connected load in VA.
- Phase totals and the total connected load, so the next electrician can see how the panel is balanced.
Template fields
| Section | Fields |
|---|---|
| Header | Panel name, location, fed from, voltage, phase and wires, bus rating, main breaker or main lugs only (MLO), short-circuit (AIC) rating, surface or flush mounting, enclosure type, feeder size |
| Circuit rows | Circuit number, description, load type, VA on each phase, breaker trip and poles, wire size, notes (AFCI, GFCI, shunt trip, lock-on) |
| Footer | Connected VA per phase, amps per phase, total connected kVA, demand kVA if calculated, spares and spaces |
How to read a panel schedule
On engineered drawings, the panel schedule is laid out like the panel itself: odd circuits in the left column reading down, even circuits in the right column, with the phase letter or load columns in the middle. Read each row across: circuit 7, "Receptacles – Room 104", 20 A 1-pole, 12 AWG, 1,080 VA on phase A. A 2-pole or 3-pole breaker occupies consecutive odd (or even) numbers, such as 13-15 or 14-16-18, and its load is split across the phases it touches. The footer totals are what the engineer used to size the feeder; the demand load from the load calculation is usually lower than the connected total.
Circuit numbering
Circuits are numbered top to bottom, odd on the left and even on the right. Each horizontal pair shares a phase:
- Single-phase 120/240 V: circuits 1 and 2 on leg A, 3 and 4 on leg B, 5 and 6 on A, and so on. A 2-pole breaker on 1-3 connects to A and B.
- Three-phase 208Y/120 V or 480Y/277 V: 1 and 2 on A, 3 and 4 on B, 5 and 6 on C, 7 and 8 back on A. A 3-pole breaker on 1-3-5 connects to A, B and C.
Some manufacturers number sequentially down one side; follow the numbers stamped on the panel deadfront and keep the schedule consistent with them.
How to balance a panel
In a single-phase 120/240 V panel, vertically adjacent spaces alternate between the two phase legs (A and B). The goal is to keep the connected load on each leg roughly equal so neither leg carries far more current than the other, and so the neutral carries as little unbalanced current as possible.
- List every circuit with its load in VA.
- Place 240 V two-pole loads first; they load both legs equally.
- Distribute the 120 V circuits, alternating large loads between A and B.
- Check the totals: a difference of more than about 10–15% between legs is worth rearranging.
In three-phase panels, circuits rotate through A, B and C. The generator does the rotation and shows the phase totals as you type.
Worked example: single-phase 120/240 V
The 240 V loads (range 12,000 VA, dryer 5,000 VA, water heater 4,500 VA, air conditioner 5,000 VA) split evenly: 13,250 VA on each leg. The 120 V circuits were landed as they came:
| Leg A | Leg B | |
|---|---|---|
| 240 V loads (half each) | 13,250 VA | 13,250 VA |
| 120 V circuits | 2 kitchen, microwave, laundry, bath: 5 × 1,500 = 7,500 VA | Dishwasher 1,200, disposal 800, lighting 1,200 and 1,000: 4,200 VA |
| Total | 20,750 VA | 17,450 VA |
Treating the range and dryer as pure 240 V loads (their small 120 V clock, light and motor loads are ignored here), only the 120 V circuits put current on the neutral: 7,500 ÷ 120 = 62.5 A on A against 4,200 ÷ 120 = 35.0 A on B, so the neutral carries the 27.5 A difference at full connected load. Moving the bath circuit (1,500 VA) to a leg-B space gives 6,000 VA and 5,700 VA of 120 V load, leg totals of 19,250 VA and 18,950 VA, and an unbalanced neutral current of only (6,000 − 5,700) ÷ 120 = 2.5 A.
120/208 V panel schedule example (3-phase)
This is the panel on page 5 of the PDF: a 208Y/120 V, 3-phase, 4-wire panel feeding a rooftop unit, a water heater, a unit heater, lighting and receptacles.
| Circuit | Load | A | B | C |
|---|---|---|---|---|
| 1-3-5 | RTU-1, 3-pole, 15,000 VA | 5,000 | 5,000 | 5,000 |
| 7-9 | Water heater, 2-pole 208 V, 4,500 VA | 2,250 | 2,250 | |
| 11 | Lighting | 1,800 | ||
| 2 | Receptacles, 8 × 180 VA | 1,440 | ||
| 4 | Receptacles, 7 × 180 VA | 1,260 | ||
| 6 | Sign | 1,200 | ||
| 8 | Lighting | 1,600 | ||
| 10 | Lighting | 1,000 | ||
| 12-14 | Unit heater, 2-pole 208 V, 2,000 VA | 1,000 | 1,000 | |
| Total | 11,290 | 9,510 | 9,000 |
The average is 29,800 ÷ 3 = 9,933 VA per phase, and phase A is 13.7% above it (11,290 ÷ 120 = 94.1 A against 79.3 A on B and 75.0 A on C). Moving the circuit-2 receptacles to circuit 18, a C-phase space, gives 9,850 / 9,510 / 10,440 VA (82.1, 79.3 and 87.0 A), and the worst phase is now 5.1% from the average.
480Y/277 V panel schedules
A 480Y/277 V panel is laid out like a 208Y/120 V one, with circuits rotating through phases A, B and C, but what it feeds is different:
- Single-pole circuits are 277 V, used for lighting. There are no 120 V receptacles; those come from a step-down transformer feeding a separate 208Y/120 V panel, and the transformer shows up on the 480 V schedule as a 3-pole load.
- Two- and three-pole circuits are 480 V: rooftop units, motors, large heaters and transformers.
- Amps per phase are VA ÷ 277 for each line-to-neutral load. A 4,000 VA lighting circuit draws 4,000 ÷ 277 = 14.4 A, about 18.1 A once you apply the 125% factor for a continuous load, so it fits a 20 A breaker. The same 4,000 VA at 120 V would draw 33.3 A.
Use page 4 of the PDF or the 480Y/277 V sheet in Excel, which divides by 277 instead of 120.
Panel sizes: 20, 24, 30 and 42 circuits
The number of circuits a panel can hold is the number of spaces, and each pole of a breaker takes one space. Residential load centers are commonly sold in 20-, 24-, 30-, 40- and 42-space sizes, and commercial panelboards are usually 30 or 42 spaces, with 54 and 84 in larger sections. Use the 24-space page for anything up to 24 circuits and the 42-space page above that; cross out the rows the panel doesn't have so nobody reads a missing space as a spare. Tandem (twin) breakers only go in the positions the panel's label allows, and each half is listed as its own circuit (for example 1A and 1B).
What inspectors look for
- A complete, legible directory with every circuit identified by specific purpose, including spares (408.4(A)).
- The source of supply marked on panels in other than one- and two-family dwellings (408.4(B)).
- Schedule matches the panel: breaker sizes, poles and circuit numbers on the directory agree with what is installed.
- Handle ties or common-trip breakers on multiwire branch circuits, and AFCI or GFCI protection where the schedule says it is.
- Available fault current marking where required, and a panel and breaker short-circuit rating that meets it.
Tips for inspection-ready labels
- Use locations and uses, not people: "Primary bedroom receptacles," not "Mom's room."
- Name dedicated appliances: "Dishwasher," "Range," "EV charger – garage."
- Mark spares and spaces as SPARE (breaker installed) or SPACE (no breaker).
- Note AFCI and GFCI protection on the directory; it helps with troubleshooting.
- Print on durable stock or use a label that holds up to heat inside the panel door.
Frequently asked questions
Is a panel schedule required by code?
Yes. NEC 408.4(A) requires a circuit directory that identifies every circuit's specific purpose. Engineered projects also include a panel schedule on the drawings.
What's the difference between a circuit directory and a panel schedule?
A circuit directory is the label on the panel door listing what each breaker feeds. An engineering panel schedule adds breaker ratings, loads, phase balancing and totals, and is usually part of the construction drawings.
How balanced does a panel need to be?
The NEC does not set a percentage. A common design target is keeping each phase within about 10–15% of the others, but the real limits are the feeder and neutral ampacity and the main rating.
Is there a printable PDF panel schedule?
Yes. The PDF panel schedule has blank 24- and 42-space schedules for 120/240 V single-phase panels and 42-space schedules for 208Y/120 V and 480Y/277 V three-phase panels, plus a filled-in 208Y/120 V example. For a schedule from the generator above, use your browser's print command to save a PDF.
Can I download the template in Excel?
Yes. The Excel panel schedule has 42-space sheets for 120/240 V single-phase, 208Y/120 V and 480Y/277 V three-phase panels, with phase totals, amps and imbalance calculated.
Does the generator work for 3-phase panels?
Yes. Choose 208Y/120 V or 480Y/277 V and it rotates circuits through phases A, B and C.
Related
Bidding the whole service or panel change? SparkQuote counts the panels, devices and fixtures on your PDF drawings and turns the panel, breakers, feeders and labor into a priced proposal. See the electrical estimator.
Last updated: October 6, 2026. Based on NEC 2023 Article 408. Check results against the code edition and local amendments your jurisdiction enforces and with the AHJ; electrical work should be done by qualified people.
Sources
- NFPA 70, National Electrical Code, 2023 edition (NFPA offers free read-only access). Values on this page follow the NEC 2023; check the edition and local amendments your jurisdiction has adopted.
- Sections cited: 408.4(A) and 408.4(B).
- How the numbers are checked: how we build our calculators.